Medical Air Technology | Tel: +44 (0)844 871 2100
Working with hospitals to maintain critical air systems
A fully functioning and compliant critical air system is crucial to the successful operation of the complex hospital environment, where downtime can be catastrophic for patients and business. More and more hospitals across the UK are using MAT FM’s specialist tailored support service to maintain their critical air systems, whether as an aftersales service following installation of a critical air system from MAT or to service, verify and validate equipment from another supplier. The company has recently won major contracts at some of the country’s leading hospitals, including Addenbrooke’s Hospital in Cambridge, Northampton General Hospital, Guy’s Hospital in London, and Hillingdon Hospital, also in London, all of which will be assured of receiving outstanding care from MAT FM’s team of well-equipped, skilled and experienced engineers, located throughout the UK to ensure all service calls are dealt with quickly and effectively.
An End-to-End Service
MAT FM maintains all HTM 03-01, HBN 04-01, ACDP, ISO, EU GMP, COSHH and CIBSE-regulated critical air systems, offering a flexible end-to-end service that may include an initial consultation and an audit or health check to evaluate needs and advise on a solution. Current requirements and equipment are then reviewed and an asset register developed. This is followed by compilation of a comprehensive report and recommendations highlighting key action points.
MAT FM can then provide a full programme of service and support, designed around each hospital’s needs:
Validation and verification: Validation and annual verification of specialised ventilation systems, arequirement of HTM 03-01 relating to the design and testing of hospital ventilation systems for critical areas such as operating theatres, pharmacies and aseptic suites.
Servicing: An annual service agreement that protects you and your environment, offering twice yearly verification, compliance testing and certification of all ultraclean systems and containment cabinets, regardless of manufacturer.
One-off repairs: Reactive maintenance for essential repairs.
Inspection and monitoring: A full inspection and monitoring service of all critical ventilation systems.
Scheduled maintenance: A range of planned preventative maintenance service packages.
Full details of the services offered by MAT FM can be found in our new brochure, which is available to download section of the website
For more information, please email: service@medicalairtechnology.com or call 0844 8712100
Written and distributed by: Medical Air Technology FM
Further information:
Pam Brierley
Call: 0844 871 2100
After completing several previous cleanroom and containment laboratory projects at Imperial College London, MAT was proud and excited to once again have the opportunity to work in partnership with such a prestigious institution to deliver the new research environments.
After initial designs were developed and approved, building work began in summer 2020 and the new cleanrooms were handed over in June 2021, the entire project having taken just 11 months.
Imperial College London is a global top ten university with a world class reputation. Its alumni include 14 Nobel Prize winners, including Sir Alexander Fleming.
To enable the highest level of research, the university offers the best
possible facilities. One of its flagship buildings is the £90m Sir Michael
Uren Hub, located at the White City campus. Designed as a
collaborative facility, the 13-storey Hub provides space for Imperial’s
world-leading researchers, engineers, scientists and clinicians to work
alongside one another to investigate some of the twenty first century’s
most urgent biomedical and healthcare problems.
FEATURES CONTAINED WITHIN THE CLEANROOMS:
The new cleanrooms MAT was commissioned to design and build both had to be ISO Class 6 standard to safely accommodate the semiconductor research that would be carried out in them. Class 6, as defined in ISO 14644-1:2015 Cleanrooms and Controlled Environments, refers to the cleanliness levels that must be met within the cleanroom.
In addition to having a high air change rate, an ISO 6 environment must be accessed through airlocks to preserve pressurisation differentials and prevent the migration of particles from outside into the cleanroom space, increasing one class at a time. So, users should pass through an ISO 8 environment, then an ISO 7 environment, before entering the ISO 6 cleanroom.
MAT acted as the designer and main contractor on the cleanroom project, working closely with the university to ensure minimum disruption to the other activities being carried out in the Sir Michael Uren Hub.
The team developed a design built around the complex research equipment and specialist tools that would be housed in the new cleanrooms. Work included final services connections and extensive bottled and house gases installation to several hazardous gases and associated gas detection systems.
HVAC design is complex and requires a highly skilled delivery team.
MAT is an expert in the provision of specialist HVAC systems. The HVAC system is at the heart of cleanroom design. Cleanroom HVACs differ from standard systems in that they have an increased air supply, different airflow patterns, use of high efficiency particulate air (HEPA) filters, and room pressurisation, and clean to dirty room air cascades.
In order to meet the required air cleanliness, the air must pass through HEPA filters. The lower the ISO class, the more often the air must pass through the HEPA filter. This ‘air changes per hour’ rate (ACH) and the room volume are used to calculate the HVAC’s required airflow. A conventional HVAC system usually makes two to four air changes per hour, whereas in a cleanroom it can range anywhere from 10 to 250 or even more.
The ISO Class 6 cleanrooms at Imperial College London require air change rates from 50 to 70 per hour.
MAT designs, manufactures and installs bespoke critical ventilation systems and turnkey project solutions for new build and refurbishment projects. As a specialist contractor with many years’ experience, we are passionately committed to improving patient protection and end-user safety in demanding clinical, research and drug production arenas.
We have extensive experience of working in live environments and understand the challenges around delivering a project within an operational scenario.
In addition, MAT FM provides a range of competitively priced and highly effective service and maintenance packages for all core products and turnkey solutions offered by MAT or other suppliers, ensuring that equipment is maintained, serviced and validated correctly for optimum performance.
For more information, please contact Will Evans:
Email: will.evans@medicalairtechnology.com
Tel: 0844 871 2100
Need solutions? Let’s work together
Contact us for more information on our products and services.
Accreditations:
Stay Connected: