The Robert Jones and Agnes Hunt Orthopaedic

Hospital

MAT ECO-flow Stealth 3200 ultraclean ventilation canopy at the Robert Jones and Agnes Hunt Orthopaedic Hospital

We’re close to handover of the turnkey fitout of Theatre 12 at the Robert Jones and Agnes Hunt Orthopaedic Hospital in Oswestry.

The picture shows the MAT ECO-flow Stealth 3200 ultraclean ventilation canopy, which extends the hospital’s surgical facilities and complements Theatre 11 and adjacent Recovery, fitout of which was completed by MAT in 2025.

 

As part of the turnkey fitout, we installed the full critical ventilation system, MEP services, theatre specialist equipment, building works and finishes. We also built a clinical store at ground floor level, replaced roof coverings

across part of the existing roof, and installed an equipment/bed lift within the facility. 


When the original plant room was installed, it was designed for future expansion of the facility, of which Theatre 12 now forms a part.

 

Thank you to the project team at the hospital, who are always an absolute pleasure to work with.


Learn more about ECO-flow Stealth UCV system.


Latest News from MAT and MAT FM

ECO-flow Stealth 3200 ICV canopy at Hereford Country Hospital
Hereford County Hospital
MAT's commissioning team is preparing to hand over the ECO-flow Stealth 3200 UCV canopy and critical ventilation system within the hospital’s new modular obstetric operating theatre.
Net Zero targets – Scope 1,2 & 3
MAT is pleased to share that we have a defined and measurable Carbon Reduction Strategy (CRS) in place, in line with the Greenhouse Gas (GHG) Protocol Corporate Accounting and Reporting Standard.
Liv McCarthy on-site learning about MAT
Introducing Liv
We’d like to introduce our Year in Industry student, Liv McCarthy.