The hospital wanted the new theatre to be completed during the relatively quiet Easter period. As the work would include not only installation of a UCV canopy, but also considerable preparatory work to prepare the space. and full refurbishment including a new ceiling and complete redecoration, carefully scheduling to ensure minimum disruption to staff and patients was essential. The only access to the new theatre was through the clean corridor the hospital anticipated this could be an issue, as noise and dust are an inevitable byproduct of major building works.However, thanks to close liaison between the teams from MAT and the hospital. and a high level of professionalism and commitment to client needs throughout. the anticipated issue failed to cause problems, and the project was handed over on time and within budget.
Nick Fox
Executive Director,
BMI Mount Alvernia Hospital